2022 CIT Schools’ Bridge Challenge

Wednesday June 29, 2022

29 June 2022

The annual CIT Construction and Engineering Bridge Challenge was held last week. Project Coordination has proudly sponsored this event since its inception. The aim is for teams of students in years 9 and 10 to design and construct a bridge from a specific set of materials, to support the heaviest load possible.

🏆 Congratulations to all the winners, particularly the team from Kingsford Smith High School, Ashley Savage, Luca Poole, Dwayne Du and Alira Librando, who’s bridge design held a whopping 250kg without breaking!

We look forward to welcoming some of these aspiring engineers to the industry in the future.